Basement Finishing Progress

We're finishing our basement this year. We'll use this page to keep visitors updated with our progress.

What's completed:

  • Pressure-washed foundation walls
  • Applied polyurethane caulk to seams between foundation walls and floor
  • Applied UGL Drylok to foundation walls (to keep out moisture and radon)
  • Re-routed waste pipe from laundry room floor drain to go directly to basement floor drain (previously dropped on basement floor about 6' from drain)
  • Soffit built around small beam on south end
  • Soffit built around heating/a.c. ducts and water pipes
  • Soffit built around large beam and drain lines through middle of basement
  • Framed half bath
  • Framed bar area
  • Framed closet
  • Water supply lines run to half bath
  • Closet flange for toilet and drain line for sink installed (thanks Paul!)
  • Built soffit above fireplace to hide gas line
  • Framed game room
  • Framed media room.
  • Plumber replaced main water shutoff valve and system drain valve to fit more compact area
  • Re-framed chase around water shutoff
  • Electrical wiring run, additional circuit breakers installed
  • Recessed lighting, outlet/switch boxes and fan box installed
  • HVAC tech installed 4 heat vents, cold air return, 2 combustion air vents for furnace room, and vented the bath fan.
  • Built platform below fireplace.
  • Built "half wall" behind toilet in bathroom.
  • Re-worked framing around water line (again) -- had to replace a badly warped board, plus changed my plans a little in that area to allow for speaker placement.
  • Install fireplace
  • Run gas line to fireplace
  • Electrician relocated one wall sconce and one outlet (due to my changing the framing around the water line).
  • Installed "whole house" surge suppressor
  • Speaker wire run from amplifier location to all remote speaker locations
  • Run cable television lines
  • Run telephone line
  • Rough-in inspection
  • Drywall company selected, bid accepted (rock, tape & mud, ceiling spray)
  • Drywall final measuring completed
  • Gas line pressure test (finally passed 11/12 after repairs to Prieb work)
  • Built access panel to fill pass through behind stereo location.
  • Emptied everything out of all rooms except furnace room
  • Insulated
  • Drywall delivered (88 4'x8' sheets)
  • Drywall hung (11/29)
  • Taped and mudded (12/2-5)
  • Ceiling spray and wall texture applied (12/7)
  • Accepted a bid from a cabinet maker for our media room and bar area (12/11)
  • Primed (thanks to our friend John Fetto for the use of his Wagner sprayer... sorry we broke it)
  • Painting (game room, bath, and media room all done)
  • Vanity cabinet installed in half bath (lavatory/countertop on order)
  • Laminate floor installed in game room
  • Completed electrical installation (switches, outlets, mini lights, doorbell chime)
  • Installation of access panels and vents
  • Completed low voltage wiring hookup (stereo speakers, phone, cable TV)
  • Hung doors
  • Wallpapered in bath (thanks to our friend Sue Drake!)
  • Install laminate floor in bath
  • Cased and trimmed egress window
  • Pool table set up (1/17/05)
  • Build and install cabinetry (all complete 1/18/05)
  • Completed fireplace installation (ignition, fan kit, decorative front) and test (1/19/05)
  • Add base moulding to laminate floor
  • Completed installation of "hockey puck" lights in media room (above bookshelves), plus dimmer (1/28/05)
  • Stained bar cabinetry (1/29/05)
  • Stained media room cabinetry (1/30/05)
  • Selected and ordered furniture (sofa, loveseat, chair, ottoman)
  • Cabinetry spray-lacquered (2/5/05)
  • Carpet measured and ordered (2/14/05)
  • Tile for fireplace surround ordered (scheduled to be in by 2/24/05)
  • Purchased toilet
  • Attach lavatory (countertop) and side splash to bath vanity
  • Installed vents under outside faucet locations (to prevent freezing)
  • Toilet and faucet installed in bath (2/21/05)
  • Installed tile around fireplace (2/26/05)
  • Added quarter-round to laminate floor (finished 2/27/05)
  • Added decorative trim around fireplace (2/28/05)
  • Grouted fireplace tile (2/28/05)
  • Primed and painted doors
  • Re-did casing and trim on egress window (3/4/05)
  • Carpet installed (3/3/05)
  • Furniture delivered 3/3/05: unfortunately the couch would not fit through the basement door (due to low ceiling clearance) and we had to send the furniture back. :(
  • Base moulding in media room
  • Installed door knobs
  • Final inspection passed (3/4/05)
  • The original builder came out to look at the ceiling height in the stairwell and made some recommendations. They think we can raise it up safely by 4-6".
  • Connected TV and electronics in media room
  • Moved our library of DVD's, VHS, and CD's into media room
  • Bought light to hang over pool table
  • Primed and painted egress window trim (Sheila)
  • Increased ceiling clearance at foot of stairs by 5" to allow furniture to fit in (fingers crossed)
  • Hooked up VCR/DVD in game room
  • Mounted wall speakers in game room
  • Installed light over pool table
  • Furniture delivered (3/10/05)

What's in progress:

  • Touch-up painting as needed
  • Decorate
  • Enjoy!

What's still to come:

  • Drywall, tape, and mud modified ceiling at bottom of stairs
  • Clean up my disaster of a furnace room and turn it into a workshop